I got both loads contracted for $2400…
I got both loads contracted for $2400 but it cost $500 to $1250 more in the end. I should have gone with the most expensive bid as they were more prepared for contingencies.
美国
I got both loads contracted for $2400 but it cost $500 to $1250 more in the end. I should have gone with the most expensive bid as they were more prepared for contingencies.