企业入驻搜索写评价分类关于
简体中文English

Marty Wasserman

新加坡

1 评价
2 被浏览
0 有帮助

1 条评价

sourceit.com.sg

Paid in full in May, room still does not work in August

I paid SGD 11,138.60 in full on 20 May 2026 for a meeting room AV installation. As of August the room has never worked. The table controller that operates the room has power but has never had a network connection, and its network settings page is empty. The wall panel outside the room is connected, but it was never set up. The room has never been signed in or commissioned. The invoice included line items for System Configuration and Basic user training. On 16 July the sales rep wrote to me that once our Google Meet licensing and room resource were in place, they would "complete the room setup, sign-in, testing and commissioning." I confirmed both were done the next day. On 29 July, thirteen days later, the same rep told me that configuration was the client's responsibility and offered to send an engineer as a gesture of goodwill. I asked the director for an itemisation of that line and a credit note for the parts not delivered. He declined, while confirming in the same email that the line covers hardware configuration and onsite training. I also asked whether the panel was tested and working before the installation team left site, and for the record of that test. I have had no answer. We have since engaged a different reseller to finish the room, so we are paying twice for the same work. Ten weeks, one working component, and a refusal to itemise what we were billed for.

2026-08-03已认证