Watch out for the things they don't tell you upfront.
Took forever from meeting with sales guy to job completion. The guy that comes out to take the final measurements is not included in the cost of "the job". No, that guy is an additional $350.00 tacked onto the bill. I think that for the outrageous price that the measurements should be part of the deal. But measurements are not. Two days before scheduled install my boyfriend called and asked if we need to take down the existing blinds. He was told that the installers would take them down. What he was not told was that there would be a $100.00 per window charge to have the installers take the blinds down. All the installers had to do was flip two little flaps per window up, remove blinds, reinstall blinds into original, existing brackets, close flaps on brackets. $100.00 each time they made those 4 moves. They did not remove the brackets, so that tells me that the blinds were removed for their conveinance, not mine. Then to top it all off, they charged $100.00 to remove and reinstall the blinds on a window that has not had blinds or the brackets installed for over a year. I know because I am the one who took the blinds down along with the brackets. We still don't have blinds installed for that window. But we got charged $100.00 anyway. We didn't get an itemized bill until my boyfriend asked for one. He paid the bill off completely within the month after the install was complete but didn't get itemization until after bill was paid.